Last reviewed 19 November 2026 · SMEDTEC
EU MDR: Articles 85 and 86
Article 85: manufacturers of class I devices prepare a PMS report summarising the results and conclusions of their PMS data, with any preventive and corrective actions. It is updated when necessary and made available to the competent authority on request.
Article 86: manufacturers of class IIa, IIb and III devices prepare a PSUR for each device, or each category or group of devices, setting out the benefit-risk conclusions, the main PMCF findings and the volume of sales with an estimate of the population using the device. Class IIb and III: at least annually. Class IIa: when necessary and at least every two years. For class III and implantable devices the PSUR goes through the electronic system to the notified body, which adds its evaluation; for the others it is made available to the notified body and, on request, to competent authorities.
EU IVDR: Articles 80 and 81
Article 80: manufacturers of class A and B devices prepare a PMS report, updated when necessary and made available to the notified body and the competent authority on request.
Article 81: manufacturers of class C and D devices prepare a PSUR, setting out the benefit-risk conclusions, the main PMPF findings and the volume of sales, updated at least annually. For class D devices it goes through the electronic system to the notified body for its evaluation.
Legacy devices too
Devices still on the market under the transitional provisions follow the MDR's and IVDR's post-market surveillance requirements, not the directives' (MDR Article 120(3d); IVDR Article 110(3d)).
The European Commission proposed a targeted revision of the MDR and IVDR in December 2025. At the date this page was reviewed it had not been adopted, so the rules below still apply; check whether that has changed before you rely on them.
Keeping the cycle on time
A PSUR is late long before its due date: data collection, PMCF or PMPF inputs, sales figures and review all have to happen first. In SMEDTEC OS, a post-market surveillance programme starts when a product goes on sale, with its first cycle due a year later. You set each cycle's due date to the frequency that applies to the device, and each cycle shows on the calendar with a notification seven days before it falls due and again if it is overdue. SMEDTEC OS does not work out the frequency from the device's class: that stays your decision.
PMS reports and PSURs by class
| Regulation | Class | Document | Update |
|---|---|---|---|
| EU MDR | Class I | PMS report (Art. 85) | When necessary |
| EU MDR | Class IIa | PSUR (Art. 86) | When necessary, at least every two years |
| EU MDR | Class IIb and III | PSUR (Art. 86) | At least annually |
| EU IVDR | Class A and B | PMS report (Art. 80) | When necessary |
| EU IVDR | Class C and D | PSUR (Art. 81) | At least annually |
A good fit for
- Manufacturers with several devices whose post-market cycles fall at different times
- Teams who want each cycle's due date, owner and evidence in one place
Not the right tool for
- Writing the PSUR or analysing PMS data: SMEDTEC OS schedules and holds the work, it does not produce the report